What’s New? for SolidWorks 2012 (a most tasty & complete list from SWW11 )

2012Some say the world will end in 2012.  There are a lot of books being rushed to market right now that make some amazing claims about what’s going to happen just 22 months from now (Dec 21, 2012).  SolidWorks Corp seems gleefully oblivious to all of this hoopla, as they have put a lot of effort to bring new capabilities to SolidWorks 2012.  Here  are some highlights.

There’s a few generic user interface capabilities to be added:

  • A pushpin function will be added to allow users to put choice drawings, models or assemblies in a quick access flyout menu.
  • Users can now switch between units of measure via a selection tool added to the status bar.
  • A new command filter search will be added to allow users to search for SolidWorks commands on-the-fly (has opposed to stumbling around the Help file).
  • Selecting an item in the graphics view will highlight it and zoom to it within the feature tree (finally!).

Sheet metal will see several improvements:

  • Users will be able to choose faces to ignore in flat patterns.
  • Swept flange feature will be available.  They will be flattenable.
  • Tangent Flange position function.
  • Users will be able to set flanges parallel to a sketch.

Improved equations dialog boxBig news about equations:

  • Improved equation editor, with solve order and sort.
  • Global variables are now editable via the equation editor window.
  • Auto-rebuild for immediate implementation of changes.

On drawings:

  • BOMs will be insertable without having a pre-selected view.
  • Exploded views will be an option in the View Pallet.
  • Balloon order sequencing will be available, with the ability to number around a view from any start location.
  • Magnet Lines!!! (someone at SolidWorks Corp. was listening)
  • Unused View Label letters will be automatically reused.
  • Ability to add center marks to entire view.

Assembly will have a new Design Review mode that allows users to open and explore large assemblies without all the overhead lag.  This function will include the ability to conduct walk-throughs.

In an apparent extension of functionality added with SustainabilityXpress, SolidWorks 2012 will give users the ability to conduct manufacturer part costing.

New motion sensors will be added for actuator forces, baring loads and travel limits.

And now, the much hyped changes to be made in SolidWorks 2012:

  • Feature Freeze (they are going to try implement it again).
  • Complete Uninstall, with new options that allows for more control.  Also, uninstall function will be available from Admin Image.
  • Files will be cleared from memory when they are closed.
  • Dual monitor support will allow SolidWorks to span across two displays in a logical manner.

My road to becoming a presenter at SolidWorks World

My presentation at SolidWorks World 2011I have now been to four SolidWorks World conferences.  My first was in 2008.  As with most attendees, my first time was overwelming.  So much information is packed into such a short time frame.  There are three general sessions and up to 11 opportunities to learn in breakout sessions. 

The real value in SolidWorks World are those breakout sessions.  Nowhere else is it possible to learn from first hand interaction about so many different SolidWorks related topics in one place.  Yet, the topics aren’t just about SolidWorks itself.  One of the most helpful sessions I’ve attended was about how CAD can work within an FDA regulated environment.

This inspired me.  I wanted to present my own breakout sessions to share my knowledge.  What could I talk about?  Well, I know drawings very well.  In 2008, I submitted my first presentation proposal on drawings for SolidWorks World 2009.  It was rejected.

In the meantime, I started presenting locally at the SolidWorks User Group meetings.  I did two presentations (written about here and here) that covered SolidWorks World 2008 at the Tri-Valley SolidWorks User Group and the Silicon Valley SolidWorks User Group.

I also started presenting at the SolidWorks User Group Network Technical Summits.  In Los Angeles, CA in 2008, I gave a presentation on advanced drawing tips and tricks.  In San Jose, CA in 2010, I gave another well received presentation on advanced SolidWorks customization techniques.  If someone cannot make it to SolidWorks World, I recommend attending a Technical Summit when is in their area.

I didn’t submit any breakout session proposals for SolidWorks World 2010.  It turns out that I ended up being a co-presenter of sorts for the Stump the Chumps II breakout session.  Jeff Mirisola organized this presentation.  My role was small, but this was my debut on a breakout session stage at SolidWorks World.

I was again inspired to submit my own breakout session proposals for SolidWorks World 2011.  To my delight, both of my proposals were accepted.  However, I soon realized that my time would be limited again.  I had to make the hard decision to withdraw one of my proposals.  This allowed me to focus on making sure my one presentation was high quality.  My presentation was Establishing CAD standards within a SolidWorks Environment, written about here.  (I’ll talk more about the content of my presentation at a later time.)

My presentation was well received.  I was approached by many individuals over the next two days at SolidWorks World 2011 to thank me for the presentation.  This was an unexpected bonus that made the whole endeavour very rewarding.  I’ve given back to the same community that has benefited my growth so much.  I hope that I will be able to give two presentations at SolidWorks World 2012!

SolidWorks Live Buildings announcement

At SolidWorks World 2011, a new AEC product was announced.  It’s called SolidWorks Live Buildings.  It is a 3D conceptual design tool focused on integrated planning and early cost estimation for building design.  SolidWorks hopes that this new tool will improve collaboration between architects, engineers and builders. 

SolidWorks Live Buildings is based on the ENOVIA V6 online platform.  The interface should look familiar to current V6 users.  The product will enable any team member to access models from anywhere and anytime.  According to SolidWorks,

There is no need to transfer large data files via email or FTP sites. Since everyone has access to the same model, there is no chance of working on the wrong version of a project.

The presentation of SolidWorks Live Building was impressive.  Its easy of use was demonstrated on SolidWorks’ future headquarters.  Stairs, walls, cubical clusters, doors, and stair tools were all added quickly.  They also showed off a sundial feature which tracks the sun’s position and time of day (or night) to change shades and analyse lighting.

SolidWorks is planning general availability for the second half of 2011.